Skip to main content

Battery Basics

A guide to battery runtime and charge-time estimates, focused on turning capacity and current into sensible planning figures without overstating what a quick formula can promise in real use.

Key formulas

Runtime estimate
runtime = battery capacity / load current
Charge-time estimate
charge time = battery capacity / charge current

Why battery estimates need caution

Battery maths is useful for first-pass planning, but real runtime and charge time depend on chemistry, temperature, discharge profile, charger behaviour, and system losses.

That means the quick result is best treated as a planning estimate, not a guaranteed operating figure.

Common mistakes

  • Treating nameplate capacity as if all of it will be delivered under every load condition.
  • Ignoring conversion losses in the wider system.
  • Assuming a charge current stays constant from empty to full.
  • Reading runtime estimates as exact promises rather than broad planning figures.
Related calculators

Apply the topic straight away.